Structured Cabling and Cleaning

Home / Services Details

Structured Cabling and Cleaning

Map Before You Pull

  • Digital layout checks tray fill, bend radius and fire lanes
  • Colour-coded pathway plan avoids day-two spaghetti
  • Pre-labeled patch-panel scheme approved by your team

Install Fast—Test Once

  • Certified copper & fibre ends; every run Fluke-tested on site
  • Factory-terminated trunk cables halve install hours
  • Results uploaded to cloud portal for instant sign-off

Keep Airflow Clean & Efficient

  • ISO-class particulate sweep of tiles, grilles and cabinets
  • Hot-aisle / cold-aisle barriers checked for bypass leaks
  • Anti-static wipe-down protects optics and fans

Audit-Ready Documentation

  • As-built” CAD + cable schedule delivered within 48 h
  • OTDR and copper attenuation reports bundled for TIA compliance
  • Landlord or colo operator can sign hand-back immediately

Why Cabling & Cleaning Need Specialists

Hidden Risk
Business Impact
Our Safeguard
Unbalanced tray fill
Future adds cause kinks & crosstalk
Pre-plan pare capacity
Untested links
Intermittent latency, packet loss
Link-cert testing with Fluke DSX & OptiFiber
Dust beyond spec
Fan failures, thermal throttling
Deep clean
No “as-built” doc
Audit delays, lease penalties
Digital twin & labelled ends for every port

Our Seven-Step Migration Framework

Site Survey & Design
  • Laser-measure pathways; validate weight loads & fire stops
  • BIM model produced for clash detection and future adds

Factory Pre-Termination
  • MPO/MTP trunks cut to length in controlled environment
  • Labels printed to match design drawing-no on-site guessing

On-Site Installation
  • Velcro and saddle-tie methods preserve cable geometry
  • Copper pairs and fibre bend radii verified on insertion

Certification Testing
  • Copper: NEXT, RL, ACR; Fibre: IL, ORL, OTDR trace
  • Failures fixed immediately—no “punch-list drift”
White-Space Cleaning
  • HEPA vacuum under floor tiles; wipe racks with anti-stat pads
  • Particle count recorded before & after for audit proof
Handover & Documentation
  • Deliver CAD, test reports, maintenance guide, warranty cards
  • Optional quarterly re-test and cleaning service available

Success Stories

Japan Flag
Tokyo, Japan

Four-Day Export Decommission

Canada Flag
Toronto, Canada

Ontario-Compliant Tech Sweep

USA Flag
Franklin Park, IL USA

USA – 24-Hour Extraction

Lille
Lille, France

Legacy Blade & Storage Retirement

Singapore
Singapore

Heavy-Unit Relocation & Cable Trace

Mumbai
Mumbai, India

High-Volume Audit, Wipe & Buyback

Frequently Asked Questions

Best practice is every 6 months or after major hardware swaps, but frequency depends on local particle counts.

Ready for a
Risk-Free Decom?

Book a 15-Minute Scoping Call